Completion of the Linz project

31 March 2026

The Linz project has been successfully completed and included the manufacturing of three large-scale industrial fan casings.

The structures were delivered to the client, meeting all technical and quality requirements.

Each casing exceeds 17 tons in weight, representing a significant challenge in terms of manufacturing technology, production organization, and transport logistics.

The project confirms our capabilities in the production of heavy steel structures and demonstrates effective collaboration between engineering, production, and quality control teams.

 

1_00Linz.jpg

2_00Linz.jpg